Critical Infrastructure Priority Projects: Stratmore Lift Station
The Stratmore Lift Station project involves the construction of a new lift station 200 feet to the southeast of the existing lift station. The existing site location is in close proximity to utilities and residential structures. A risk assessment concluded that relocation was the best option. The existing lift station is planned for abandonment.
Budget:
$700,000
Designer:
Halff Associates
Project Manager:
Brian Custer


Project Schedule
Construction to begin Summer 2021 and end Winter 2021.