The Stoner Lift Station Emergency Repair Project requires the contractor to make necessary repairs to the collapsed pipe upstream of the existing lift station as shown in the construction documents. The work includes removal and replacement of existing 48 inch gravity sewer main, dewatering, trench, shoring system, helical support piles, structural concrete pile caps, bypass pumping and miscellaneous items.