The City completed an extensive capital improvement planning effort to identify additional Critical Projects for delivery and execution in the coming years. These projects were selected by applying an Integrated Planning Approach to consider all compliance and utility obligations. As a result, this group of projects provides a balanced investment into both the City’s wastewater and water utilities. The projects were identified to address three main goals:

While these projects vary in their level of definition, the current cost for completing design and construction activities is estimated to be approximately $415 million. It is expected that additional activities, initiatives, and projects will be identified in future years as the City continues with planning activities.

A summary of the City’s Critical Projects is presented below.

Shreveport, Louisiana, USA

Critical Project information was last updated on 11/7/23 based on Spring 2023 Progress Report.

* These projects are considered “Shovel-Ready”. “Shovel-Ready” projects have completed the design phase and are pending funding for the construction phase.

ProjectCategory Asset TypeProject Delivery PhaseProject Description
70th & Pines Pump Station Rehabilitation WastewaterDesignRehabilitation of pump station & storage tank infrastructure to address condition issues.
Agurs & Glen Avenue Lift Station Rehabilitations WastewaterConstructionRehabilitation of lift stations to address current mechanical, electrical, hydraulic, & operational issues.
Airport Flume RehabilitationWastewaterStormwaterCompleted
AMISS WTP Intake Structure Improvements WastewaterDesignRehabilitation of the existing WTP Intake Structure
AMISS WTP Ozone ImprovementsWastewaterConstructionModifications to AMISS WTP, including Ozone equipment, filter equipment, & chem feed systems, & installation of high service pumps & a CO2 System
AMISS WTP Transmission Piping & Valve Replacement WastewaterDesignReplacement of the Transmission Line from the WTP to the distribution system
Amiss WTP2 Filter Gallery Pipe ReplacementWaterWater TreatmentPlanningDue to corrosion of the existing steel pipe, this project will remove and replace existing pipe through a wall.
Azalea Gardens, Attaway, Fannin, Bickham Bayou, North Hearne, North Pierre, & Linear Lift Station Improvements WastewaterDesignRehabilitation of lift stations to address current mechanical, electrical, hydraulic, & operational issues.
Backwash Pump & Sluice Gate Repairs at Twelve Mile BayouWaterWater SupplyCompletedRepairs to existing Twelve Mile Bayou pump station
BPS Emergency Generator InstallationWaterBooster Pump StationDesignInstallation of permanent backup power units at three (3) booster pump stations.
Brookmeade & Querbes SSO Mitigation WastewaterConstructionSystem improvements to 10 to 30-inch diameter gravity sewer in the Brookmeade & Querbes area.
Cadillac Lift Station WastewaterDesign*Rehabilitation of lift station to address current mechanical, electrical, hydraulic, & operational issues.
Cedar Grove Basin Capacity Improvements - Project A2WastewaterCollection SystemPlanningMitigate SSOs by improving gravity sewer hydraulic capacity in Cedar Grove Basin
Cedar Grove Force Main ImprovementsWastewaterForce MainDesignRehabilitation of replacement of portions of 36-inch diameter ductile iron pipe (DIP) force main.
Cedar Grove Lift Station ImprovementsWastewaterLift StationPlanningRehabilitation and upgrade of the Cedar Grove Lift Station.
Chemical Feed Room Repairs at Lucas WWTPWastewaterWastewater TreatmentConstructionPrepare final design deliverables for the repair of damaged concrete floor and stairs in the Chemical Feed Room at Lucas WWTP and perform a structural analysis of the damaged area. Designer services also include bidding and construction phase work.
Cherokee, Forbing Glen, & Long Timbers Lift Station Rehabilitations WastewaterConstructionRehabilitation of lift stations to address current mechanical, electrical, hydraulic, & operational issues.
Citywide AMI Water Meter ReplacementWaterDistribution SystemPlanningSystem-wide program to replace water meters.
Cross Lake Dam & Spillway Rehabilitation WaterDesign Rehabilitation of the dam & spillway that controls the level in Cross Lake
Darien, Hardy, Meadow Parkway, Patzman Park, Alabama, Pinehill Rd, North Caddo, Marjorie, Hawkins, & Pinehill Estates Lift Station ImprovementsWastewaterDesignRehabilitation of lift stations to address current mechanical, electrical, hydraulic, & operational issues.
Dilg League SSO MitigationWastewaterCollection SystemDesign*Installation of wet-weather flow storage at Atkins Park to address reoccurring SSOs at Dilg League Drive area.
Exposed Sewer Mains In Bayou Pierre WastewaterDesignRepairs to an existing inverted siphon at Bayou Pierre next to Spring Lake subdivision.
Ford Street Water Improvements WastewaterDesign*Relocation of existing 12-inch diameter water main under Ford St.
Gravity Sewer Main Improvements Broadmoor & Querbes Area WastewaterDesignEliminate residential sanitary sewer laterals from under homes in the Broadmoor & Querbes neighborhoods.
Havanna, Country Club, Fern, Cadillac, Risinger, Cross Creek, & Elgin Lift Station Improvements WastewaterDesignRehabilitation of lift stations to address current mechanical, electrical, hydraulic, & operational issues.
Huron Street Water Main Replacement WastewaterDesign*Replacement of 8-inch diameter water mains along Huron St.
Jewella/Fair/Magnum Water Main ReplacementsWastewaterDesign*Replacement of existing 6-inch diameter water mains along Jewella Ave., Fair St. & Magnum St.
Jordan Street Water Main Replacement WastewaterDesign*Replacement of existing 12-inch and 6-inch diameter water mains along Jordan Street.
Lakeside Boat, Pinecrest, & Woolworth Lift Station Rehabilitations WastewaterConstructionRehabilitation of lift stations to address current mechanical, electrical, hydraulic, & operational issues.
Land O' Trees Water Main Relocation & Sewer ProtectionWaterDistribution SystemPlanningRelocation of existing 12-inch diameter water main in private ditch.
Land O' Trees Water Main Relocation & Sewer ProtectionWastewaterCollection SystemPlanning
Land O’ Trees Lift Station Rehabilitation WastewaterConstructionRehabilitation of lift stations to address current mechanical, electrical, hydraulic,
Lead Soldered Joint Pipe ReplacementWaterDistribution SystemPlanningReplacement of lead soldered joint water lines throughout the distirubution system. This is part of the Lead and Copper Rule program and will recommend funding through the LDH SRF program.
Linwood Elevated Storage Tank Rehabilitation WastewaterDesignRehabilitation of storage tank infrastructure to address condition issues.
Lucas and North Regional WWTP Improvements (UV Disinfection) WastewaterWastewater TreatmentConstructionReplacements of existing UV equipment due to current ultraviolet disinfection (UV) equipment.
Lucas Outfall Basin Capacity Improvements - Project B3WastewaterCollection SystemDesignMitigate SSOs by improving hydraulic capacity in Lucas Outfall Basin
Lucas Outfall Basin Capacity Improvements - Project A2WastewaterCollection SystemDesignMitigate SSOs by improving gravity sewer hydraulic capacity in Lucas Outfall Basin
Lucas Outfall Basin Capacity Improvements - Project A3 (Querbes LS)WastewaterCollection SystemPlanningMitigate SSOs by improving hydraulic capacity of Querbes Sanitary Lift Station and gravity sewer in Lucas Outfall Basin
Lucas Outfall Basin Capacity Improvements - Project A7WastewaterCollection SystemDesignMitigate SSOs by improving gravity sewer hydraulic capacity in Lucas Outfall Basin
Lucas WWTP Basin Capacity Improvements - Project A3WastewaterCollection SystemPlanningMitigate SSOs by improve gravity sewer hydraulic capacity in Lucas WWTP Basin
Lucas WWTP Basin Capacity Improvements - Project B2WastewaterCollection SystemPlanningMitigate SSOs by improve gravity sewer hydraulic capacity in Lucas WWTP Basin
Mayo Road Water Main ExtensionWaterDistribution SystemDesignUsing Water Sector Program grant funding, the City will extend water line along Mayo Road from Wallace Lake Road to the Lake Shreve Estates development to remove the existing well from service and consolidate the water utility into the City distribution system.
Maywood Lift Station Rehabilitation WastewaterConstructionRehabilitation of lift stations to address current mechanical, electrical, hydraulic, & operational issues.
Pierremont Park Sewer Improvements WastewaterConstructionReplacement of existing 24-Inch diameter gravity sewer with a larger new 30-Inch.
Pump Station Standby Generator Installation WastewaterDesign*Installation of permanent backup power units at three (3) booster pump stations.
SCADA - Master Plan & ImplementationWastewaterLift StationDesignDevelopment of SCADA master plan to identify needed improvements.
Southern Hills Interceptor Replacement WastewaterDesignReplacement of 8 to 42-inch diameter concrete gravity sewer.
St. Vincent Elevated Storage Tank Rehabilitation WastewaterDesign*Rehabilitation of storage tank infrastructure to address condition issues.
Stoner Force MainWastewaterForce MainPlanningRehabilitation of portions of 36-inch diameter ductile iron pipe (DIP) force main
Stratmore Lift Station Rehabilitation WastewaterConstructionRehabilitation of lift stations to address current mechanical, electrical, hydraulic, & operational issues.
Twelve Mile Bayou Pump Station Discharge Main Evaluation WastewaterDesignRehabilitation or replacement of existing large diameter raw water main from Twelve Mile Bayou Pump Station at the AMISS Water Treatment Plan
Wallace Basin Capacity Improvements - Project A1WastewaterCollection SystemDesignMitigate SSOs by Improving gravity sewer hydraulic capacity in Wallace Basin
Wallace Basin Capacity Improvements - Project B4WastewaterCollection SystemDesignMitigate SSOs by Improving gravity sewer hydraulic capacity in Wallace Basin
Wallace Force Main ImprovementsWastewaterForce MainDesignRehabilitation or replacement of portions of 36-inch diameter ductile iron pipe (DIP) force main.
Wallace, Dixie Garden, Shreve Island, Knight St., & Mackey Lane Lift Stations Improvements WastewaterDesignRehabilitation of lift stations to address current mechanical, electrical, hydraulic, & operational issues.
Water Main Crossing at Twelve Mile Bayou WastewaterDesign*Rehabilitation or replacement of the existing 20-inch steel pipe across Twelve Mile
Water Pump Station Standby Generator Installation (Interim)WaterBooster Pump StationCompletedProject was not pursued.
West 70th Water ImprovementsWaterDistribution SystemDesign*Replacement of existing 12-inch and 6-inch water main along West 70th Street
West Shreveport Elevated Storage Tank Rehabilitation WastewaterDesignRehabilitation of storage tank infrastructure to address condition issues.
WWTP Sludge Farm Phase 2 Upgrades WastewaterDesignImprovements at the sludge processing facility including cleaning & rehabilitation of the existing sludge storage lagoon & rehabilitation or replacement of sludge drying equipment.